{"id":21986,"date":"2019-04-30T16:14:56","date_gmt":"2019-04-30T14:14:56","guid":{"rendered":"https:\/\/www.mc2.es\/?p=21986"},"modified":"2019-04-30T16:14:56","modified_gmt":"2019-04-30T14:14:56","slug":"final-phase-of-the-new-stadium-of-vallehermoso","status":"publish","type":"post","link":"https:\/\/www.mc2.es\/en\/final-phase-of-the-new-stadium-of-vallehermoso\/","title":{"rendered":"Final phase of the New stadium of Vallehermoso"},"content":{"rendered":"
The construction of the new athletic stadium of Vallehermoso<\/a> reaches its final phase. MC2 engineering consulting studio collaborates with BECSA as a construction company and CANO LASSO at the work management finalizing the deadlines of the execution of this emblematic site in Madrid, with the aim of being able to be completed at the beginning of the summer of 2019 and be able to host international competitions.<\/p>\n","protected":false},"excerpt":{"rendered":" The construction of the new athletic stadium of Vallehermoso reaches its final phase. MC2 engineering consulting studio collaborates with BECSA as a construction company and CANO LASSO at the work management finalizing the deadlines of the execution of this emblematic site in Madrid, with the aim of being able to be completed at the beginning … Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":21984,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[42],"tags":[],"yoast_head":"\n