REHABILITATION OF THE TORDERA BRIDGE

Project details

  • LOCATION: Tordera, Barcelona (Spain)
  • CLIENT: --
  • DESIGNER: --
  • CO-DESIGNER: --
  • HELPERS: José Antonio Torroja Oficina Técnica (Spain)
  • ARCHITECTURE: --
  • CONSTRUCTOR: --
  • PROPERTY: Ministry of Public Works
  • TYPOLOGY: Rehabilitation
  • PROJECT: --
  • CONSTRUCTION: 1994
  • SCOPE: Rehabilitation design, project management
  • BUDGET: --
  • AWARDS: --

Technical Data

  • Total length: 145.8 m
  • Main span: 54.3 m
  • Width: 11.5 m (widened)

Description

This famous and pioneering bridge, designed by Eduardo Torroja and built in 1939, was the first to employ a composite bridge deck as a structural solution.

The rehabilitation work consisted in widening the roadway from its original width of 8.50 m up to 11.50 m in order to meet present  traffic demands, reinforcing according to the new requirements, the lower truss sections.

In addition to widening the deck, the rehabilitation work also included the removal the bridge expansion joints.

This website uses cookies to improve your user experience. You can find more information here more info

Los ajustes de cookies de esta web están configurados para "permitir cookies" y así ofrecerte la mejor experiencia de navegación posible. Si sigues utilizando esta web sin cambiar tus ajustes de cookies o haces clic en "Aceptar" estarás dando tu consentimiento a esto.

Cerrar